NRSB RRS Mitigation: Dilution Ventilation, HRVs and ERVs

Updated 10 min read
Key takeaway

Ventilation can reduce indoor radon concentration by diluting indoor air with outdoor air, but it can also change building pressure and energy use.

  • HRVs and ERVs recover heat or heat and moisture during exchange.
  • For RRS, understand the system’s airflow, balance, controls and maintenance, and evaluate whether dilution is appropriate for the building and radon source.
On this page11 sections
  1. Pressure interactions and operating modes
  2. Dilution is one mitigation strategy, not a universal fix
  3. How an HRV differs from an ERV
  4. Calculate ventilation from an explicit design basis
  5. Balance supply and exhaust
  6. Duct layout and air distribution
  7. Energy, humidity and comfort tradeoffs
  8. When ventilation may be a poor fit
  9. Commission and maintain the unit
  10. Worked case: radon falls but pressure worsens
  11. Study HRV and ERV questions

The NRSB April 2026 RRS guide includes dilution ventilation and names heat recovery ventilators (HRVs), energy recovery ventilators (ERVs), airflow calculations, installation, duct sealing, vent placement, balancing, maintenance and client communication. The concept is straightforward: introduce outdoor air and remove indoor air to lower concentration. The design challenge is delivering that exchange safely, efficiently and without creating unfavorable pressure.

Credential
NRSB Radon Reduction (Mitigation) Specialist
Topic
Dilution Ventilation, HRVs and ERVs
Design principle
Diagnose, design, install, verify and document
Source guide
NRSB Certification Exams Study Guide, April 2026 v1.1

Pressure interactions and operating modes

A ventilation unit can behave differently at low, medium and high settings. Measure or verify airflow in the actual operating mode used by occupants. A balanced setting at commissioning may become unbalanced after filter loading, duct changes or a fan fault.

The pressure effect depends on where supply and exhaust are located and how air moves through the building envelope. Check the lower level and soil-connected spaces when radon performance is part of the design question. Do not infer balance from a display label alone.

Record the setting and conditions associated with each test. This makes a later comparison meaningful if the owner changes controls or replaces a filter.

Dilution is one mitigation strategy, not a universal fix

Ventilation dilutes radon that has already entered the building. ASD instead targets soil-gas entry by depressurizing beneath or beside the structure. The NRSB outline treats these as distinct strategies. A ventilation system may be suitable in some difficult conditions or as part of a design, but it should not be chosen merely because it is familiar HVAC equipment.

Before recommending dilution, identify the source, measured concentration, current air exchange, climate, building envelope, occupancy, HVAC and energy implications. A whole-building ventilation change can affect comfort and other pollutants as well as radon. The client should understand how the system will operate and what maintenance it requires.

How an HRV differs from an ERV

An HRV transfers heat between outgoing indoor air and incoming outdoor air while keeping the air streams separate. An ERV transfers heat and some moisture as well, depending on the unit and conditions. Both can reduce the energy penalty of ventilation compared with simply exhausting conditioned air and bringing outdoor air directly indoors.

Neither device is a radon detector or a soil-gas control system. Their impact depends on airflow, duct design, pressure balance, climate, controls and building leakage. A properly selected ventilator can provide controlled air exchange, while an incorrectly balanced system may depressurize the building or distribute air unevenly.

Do not say ERV always outperforms HRV or that one is correct for every climate. Moisture management, heating and cooling loads, indoor humidity and local energy code affect selection. Use manufacturer guidance and qualified HVAC design for the specific building.

Calculate ventilation from an explicit design basis

The RRS guide names calculating appropriate cubic feet per minute of ventilation per household size. A CFM value represents airflow volume per minute. The needed rate depends on the adopted ventilation standard, occupancy assumptions, building volume, existing air exchange and design objective. Use the formula and inputs supplied by the question or current authority; do not invent a universal radon CFM target.

For a basic dilution model, the concentration response depends on the rate at which indoor air is replaced and the radon source rate. Increasing outdoor air exchange can lower concentration only if the system’s airflow reaches the relevant space and does not simultaneously increase soil-gas entry enough to offset the dilution. The building’s pressure response matters.

When a problem gives occupants, floor area or a ventilation standard, identify which formula the question asks you to apply. Preserve units and distinguish supply airflow from exhaust airflow and net imbalance. A correct arithmetic result can still produce the wrong design if the input basis or balance is misunderstood.

Balance supply and exhaust

A balanced ventilator aims to supply and exhaust similar airflow under defined conditions. Actual balance depends on duct resistance, filters, dampers, fan settings, dirty components and room pressures. An imbalance can pressurize or depressurize parts of the building. Negative pressure near a soil-connected foundation can encourage radon entry, so commissioning should consider the whole building rather than only the unit’s rated airflow.

Measure or verify flows at the terminals using appropriate methods and adjust the system per manufacturer instructions and the applicable standard. Check that ducts are sealed and that the supply and exhaust locations serve appropriate zones. A unit’s dashboard display may not equal measured airflow after installation.

Changes to doors, return-air paths or exhaust fans can shift balance after commissioning. Record baseline readings and tell the owner to request service if filters, ducts or equipment are changed. A radon mitigation plan should account for these interactions and include follow-up measurement.

Duct layout and air distribution

The NRSB outline calls attention to duct sealing and placement of interior and exterior vents. Poor distribution can leave a room stagnant while creating drafts elsewhere. Locate supply outlets and exhaust pickups to promote intended mixing without short-circuiting air directly between them. Avoid placing an exhaust where it can re-enter a supply or opening, using current code and manufacturer clearances.

Duct leakage wastes airflow and can create pressure changes in attics, crawlspaces or wall cavities. Seal joints with approved materials and support ducts correctly. Outdoor ducts may need insulation or weather protection in some climates. Exact materials and clearances vary by product and jurisdiction.

Do not use a ventilation retrofit to mask a foundation leak or failed ASD connection. If the goal is to reduce radon, verify the chosen strategy with a post-mitigation measurement and check that the radon source is controlled or diluted as designed. A comfortable airflow does not prove radon performance.

Energy, humidity and comfort tradeoffs

Ventilation adds outdoor air that may need heating, cooling or dehumidification. HRVs and ERVs recover some energy, but they still consume electricity and require upkeep. Climate, occupancy and building envelope influence operating cost and comfort. Explain expected tradeoffs before recommending equipment, and avoid promising a precise savings figure without a supported calculation.

Humidity transfer through an ERV can be useful or undesirable depending on climate and indoor conditions. Condensate management, frost control and filter maintenance also matter. Follow the manufacturer’s installation and service instructions; a neglected core or blocked filter can reduce airflow and upset the balance.

Clients may disable noisy or drafty equipment. Select suitable equipment and communicate its purpose, controls and routine maintenance. If the ventilator is part of a radon strategy, explain why keeping it in the intended operating mode matters and arrange a method to verify ongoing performance.

When ventilation may be a poor fit

A building with severe envelope leakage, pressure-sensitive combustion appliances, limited duct routes or high outdoor pollution may require another approach or a more complex design. A high radon concentration may be better addressed by controlling soil-gas entry than by relying on dilution alone. The exact choice depends on diagnosis, building type, code and the current standard.

Ventilation can also cause outdoor contaminants, moisture or noise concerns if intake locations and filtration are poorly planned. In cold or humid climates, uncontrolled outdoor air can create comfort and building-durability problems. A qualified HVAC professional should assess the broader indoor-air system.

The RRS exam may ask for advantages and disadvantages rather than a blanket preference. State what ventilation can accomplish, name its pressure and energy implications, and compare it with soil depressurization. The correct strategy is tied to the source and building conditions.

Commission and maintain the unit

Commissioning includes confirming direction of airflow, supply and exhaust balance, control settings, duct integrity, condensate handling and any required frost or defrost sequence. Record measured airflow and operating conditions as required. The system should be tested under normal doors, filters and HVAC states, not only in a convenient temporary setup.

Maintenance usually includes cleaning or replacing filters, inspecting the core and condensate path, checking outdoor hoods and confirming fan operation. Follow the manufacturer’s schedule and document service. Explain which task the owner can perform and which requires a technician.

A reduction in airflow or a change in noise can indicate a blocked filter, fan fault or duct issue. If ventilation is part of a radon plan, recheck indoor concentration after major changes or repairs according to the approved protocol. The unit’s status light alone does not establish that radon remains controlled.

Worked case: radon falls but pressure worsens

Suppose a balanced ventilator lowers indoor radon during a test but an exhaust-dominant setting increases negative pressure near the foundation. The initial concentration reduction does not settle the design question. Check airflow balance, pressure measurements, building operation and repeat-test protocol. Determine whether the unit draws additional soil gas while diluting indoor air.

Adjust the design only under qualified direction, then remeasure under comparable conditions. It may be necessary to balance flows, address a soil-gas pathway with ASD or revise the ventilation strategy. Document each setting so the final result can be linked to the system configuration.

This scenario shows why concentration and pressure both matter. A solution should reduce exposure without creating an unstable or energy-intensive operating condition. The exam favors investigation and verification over an assumption that more ventilation is always better.

Study HRV and ERV questions

Build a side-by-side comparison: what each exchanges, what it recovers, which airflow paths it uses, how balance affects pressure and what upkeep is required. Add the limitations: neither removes the radon source; both require correct design and commissioning; and the pressure effect depends on actual airflow, not the product label.

Practice unit problems by writing the stated ventilation requirement, inputs and units before calculating. Then ask whether the rate is supply, exhaust or balanced total. If a value is absent, say what information is missing rather than making up a household-size rule.

The April 2026 guide names installation, vent locations, duct sealing, balancing and client communication. Review current standards and manufacturer instructions for exact design criteria. An RRS candidate must connect calculations to practical operation and explain the maintenance burden honestly.

NRSB’s study guide outlines the exam scope. ANSI/AARST mitigation standards and local mechanical codes govern applicable work; EPA provides consumer-level information about radon reduction. The study outline does not provide a universal airflow rate or unit model. Verify current source materials before design or installation.

This educational article is not an HVAC design specification. Use qualified professionals and current codes for equipment sizing, wiring, duct design, ventilation rates and combustion safety. A radon test before and after work should use the applicable measurement protocol.

Ventilation can be a useful tool when its airflow and building effects are understood. Its value comes from controlled, verified operation, not from assuming that an HRV or ERV automatically solves radon.

Common questions

What is the difference between an HRV and an ERV?

An HRV transfers heat between outgoing and incoming air. An ERV transfers heat and some moisture as well, depending on the model and conditions. The right choice depends on climate, humidity, building design and manufacturer guidance.

Can ventilation alone fix radon?

Sometimes dilution can lower indoor concentration, but it is not a universal solution. Evaluate the source, pressure effects, building, energy tradeoffs and applicable standard; soil-gas control may be more appropriate.

Does an HRV or ERV always keep a building pressure-balanced?

No. Actual supply and exhaust flow can differ because of duct resistance, filters, settings and maintenance. Measure or verify balance at commissioning and consider the effect on foundation pressure.

What should an owner maintain on a ventilator?

Follow the manufacturer’s schedule for filters, core, condensate path and outdoor hoods. After service or major setting changes, verify operation and consider radon retesting if the unit is part of the mitigation strategy.