The twelve categories

Stormwater and erosion control

Compiled by the Sitonce editorial team from the PSI Candidate Information Bulletin, NASCLA's own published material and the federal standards named belowUpdated 2 min readFacts verified 4 September 2026
The short answer

Construction sites disturbing land above a threshold need a stormwater permit and a pollution prevention plan, with control measures installed, inspected and documented throughout the project.

A category where the requirement is largely documentary, and failing it is a fine rather than a collapse.

The permit

Construction activity disturbing land above a regulatory threshold requires coverage under a stormwater discharge permit, with the threshold and administration varying by state.

Working without it is an enforcement matter, and it is the general contractor's problem regardless of who was supposed to file.

The plan

A stormwater pollution prevention plan identifies the sources of pollution, the control measures, the inspection schedule and who is responsible.

It is a live document. Site conditions change and the plan is amended to match.

Control measures

  • Silt fence along the down-gradient perimeter
  • Inlet protection on storm drains
  • A stabilized construction entrance to stop track-out onto the road
  • Concrete washout containment
  • Stabilization of disturbed areas as work finishes
Inspection records are the compliance

Measures installed and never inspected fail quietly. Silt fence undermined by one storm does nothing for the rest of the project, and the inspection record is what an enforcement officer asks for first.

Track-out

Mud carried onto public roads by vehicles is the most visible violation and the one that generates complaints. A stabilized entrance is cheaper than the enforcement it prevents. The plan is the compliance.

Concrete washout

Highly alkaline and cannot go into a storm drain or onto the ground. A contained washout area is standard and its absence is a routine finding.

Common questions

Do construction sites need a stormwater permit?

Where land disturbance exceeds a regulatory threshold, which varies by state.

What is a stormwater pollution prevention plan?

A document identifying pollution sources, control measures, the inspection schedule and responsibilities.

What are common control measures?

Silt fence, inlet protection, a stabilized entrance, concrete washout containment and stabilization of disturbed areas.

Why do inspection records matter?

They are the compliance. Measures installed and never inspected fail quietly, and the record is what an officer asks for.

Can concrete washout go on the ground?

No. It is highly alkaline and needs contained washout.