Reinforcement must remain at the elevation and location shown in the design while concrete is placed and finished.
More key points
- Bar chairs, bolsters, sand plates, or precast supports hold steel off the base, maintain cover, and limit movement under foot traffic and concrete flow.
- Pulling mesh up after placement is not a reliable substitute for proper support.
On this page7 sections
Steel must stay where the design puts it
Reinforcing steel contributes to concrete performance only when it is positioned where the design expects it. A slab’s bars or welded wire reinforcement may be specified near the middle or upper portion of the concrete, depending on structural design and the purpose of the reinforcement. If steel sinks to the subgrade or is pushed down during finishing, it may not provide the intended crack control or tensile resistance and the concrete cover can be wrong.
Supports—often called chairs, bolsters, bar supports, or dobies—hold reinforcement at the required elevation during placement. They must be stable on the base and strong enough for the reinforcement, workers, and construction activity expected. The number and spacing of supports come from the reinforcement layout, support product, slab thickness, bar size, and placement method. Follow the structural drawings and specifications rather than a universal chair spacing rule.
Choose a support that suits the surface
Common supports include wire chairs, plastic or composite chairs, continuous bolsters, and precast concrete bar supports. Use a support with adequate bearing area so it does not punch into a soft base or vapor retarder. Precast concrete supports need sufficient compressive strength and base area for the applied load; ACI guidance describes a 4-inch-square minimum base for the precast supports it discusses and strength at least equal to the concrete specified for the slab. Product-specific requirements still govern.
A chair placed directly on a fragile vapor retarder can puncture it, while a footed chair or sand plate can distribute load. Protect the membrane during installation and patch damage before concrete placement. On uneven subgrade, level the base or use a suitable support rather than stacking loose scraps under a chair. Make sure the support does not shift when a worker steps nearby or when concrete is discharged.
Tie and brace the reinforcement mat
Bars should be tied sufficiently to keep the mat stable through concrete placement and finishing. Tie intersections and laps as required by the design and placement plan. Use enough support rows near edges, openings, construction joints, and concentrated foot-traffic paths. Mesh is more flexible than individual bars and may need closer or more frequent supports to prevent sagging. A concrete pump hose, screed, or worker can displace a lightly supported mat.
Do not place welded wire reinforcement on the ground and then pull it upward through fresh concrete. ACI states that mesh should not be pulled up after placement or walked in after placement; supports should be close enough to keep it in position under construction foot traffic. The intended reinforcement elevation should be established before the pour. If steel moves during placement, stop and reset it before that area is covered.
Coordinate cover, embedments, and finish
The support height must preserve required concrete cover between steel and exposed surfaces. Cover protects reinforcement from corrosion and fire exposure and is tied to the member’s environment and design. Do not choose chair height by eye. Confirm slab thickness, bar diameter, top and bottom cover, and any specified elevation from the structural details. At a slab edge, chairs should not move the bar closer to the surface than allowed.
Coordinate reinforcement with sleeves, conduits, dowels, anchors, floor drains, and slab joints. If a pipe conflicts with a bar, do not cut, bend, or relocate the bar without approval. Support around openings and re-entrant corners so steel remains continuous where designed. A pre-pour inspection should check bar size, spacing, lap, cover, chairs, tie security, and cleanliness before the concrete hides the work.
Example: mesh in a garage slab
A crew places welded wire reinforcement in a garage slab over a vapor retarder. The drawings locate the mesh in the upper portion of the slab. The crew installs compatible chairs at spacing adequate for the mesh and foot traffic, adds supports near the perimeter and around the floor drain, and walks boards to distribute access loads. Before pumping, the foreman checks for sagging, tipped chairs, torn membrane, and interference with dowels. The inspector verifies the elevation before the pour.
During placement, a pump hose pushes one panel down. The crew pauses, lifts and resets the reinforcement on the proper supports while the concrete remains workable, and checks adjacent sections. They do not assume the mesh will float back to position. After the slab hardens, the correct elevation is difficult to restore without a repair.
Common mistakes and exam cues
Typical mistakes include using too few chairs, placing supports on a weak base, using a chair that punctures the membrane, walking the mat out of position, and pulling mesh upward after the pour starts. Another error is relying on a support height that does not match specified cover. Think of the chain: stable base, suitable support, tied reinforcement, correct elevation, and protected cover.
For exam questions, identify whether the reinforcement is intended to sit at a particular depth and what keeps it there. A bar chair supports and positions steel; concrete itself does not guarantee that elevation. Follow the plans and product data, and inspect before the pour. Exact support spacing is project-specific, so do not invent a standard interval absent from the drawing or specification.
Quick review
- Support reinforcement at its specified elevation before and during concrete placement.
- Choose stable supports with adequate bearing and strength for expected loads.
- Tie bars and provide closer support where flexible mesh, edges, openings, or foot traffic could move it.
- Do not pull welded wire mesh up after concrete placement or walk it into position.
- Inspect cover, support, and membrane condition before concrete conceals the work.
Common questions
Why are rebar chairs used?
They hold reinforcement at the elevation shown in the design so the steel maintains intended cover and structural or crack-control function.
Can welded wire mesh be pulled up after concrete is placed?
ACI guidance says not to place mesh on the ground and pull it up after placement or walk it into position; support it before and during the pour.
How far apart should chairs be?
Use the design, specifications, and support-product data. Spacing depends on bar or mesh stiffness, slab geometry, and construction loads.
Can a chair sit directly on a vapor retarder?